Here at PSS, we have completed a range of projects, one of which we are particularly proud of is Crusely Trailer Engineering. Our engineers have completed a year long project at Crusely Trailer Engineering, when the company had moved site and had a purpose built yard, which was implemented to meet their exact requirements. With Crusely being our client, they wanted to use one contractor for all electrical and mechanical works and selected Project Skills Solutions to provide our services.
Project Skills Solutions offer a range of electrical and mechanical installation services which we have offered to our clients. One which has included Crusely Trailer Engineering. For businesses needing their business moved and would like our services, quote the re-modelling or complete new buildings, get in touch with our installs team today. /
With Crusely Trailer Engineering was a complete new build we installed all of the mechanical electrical wiring and plant. Our engineers installed the;
- Internal and External lighting
- Network Cabling
- CCTV
- Air Conditioning and Ventilation
- Fibre Optic Cabling
- Entry/ Exist Barrier
- Client Specific Power Distribution
Project Skills Solutions Installation Services –
We installed the lighting throughout the warehouse, offices and all the external lighting across the site. In the warehouse the lighting which we installed was low energy high bay light fittings. We installed low energy T5 non corrosive fittings throughout the store rooms and low energy T5 grid lighting throughout the office. Full emergency lighting was also installed throughout the building and low energy lighting throughout, as this is the most cost effective way for the client to light the building.
Across the site, office building (hallways), warehouse and externally were a vast range of CCTV cameras fitted across the site. We installed nine CCTV cameras across the site, in the office building (hallways), warehouse and externally. The CCTV cameras have been set up for remote monitoring so that the live feed can be accessed anywhere on a smart phone or tablet as long as they have an internet connection. Entry and exit barriers were fitted so that lorries have to gain access and can’t just drive on site. There is a call point on the entry gate so that drivers can call the office and then the office staff know exactly who is coming onto the site. All staff have proximity cards so they can easily gain access and don’t need to call the office to be let on site. A fibre optic cable had to be installed because the front camera is more than 90 metres from the server room which exceeds the distance for copper cabling.
The client had specialist requirements for the power distribution for the lorry bays. Crusely needed each lorry bay to have its own distribution panel with outlets so if one bay lost power it would not affect any other bays. Panels were manufactured specific to the clients needs. We installed a 250 amp buzz bar for power distribution for the 12 lorry bays and the front machine workshop.
Air conditioning was installed through the offices, canteen and meetings rooms. There was a mixture of ceiling and wall mounted cassettes, multiple units split across three systems. A fire alarm system was also fully installed by PSS. We installed manual call points through the workshop, then smoke and heat detectors throughout the offices.
This project from the initial quote through to completion was over a year and in excess of £220,000.
If you are moving your business and want us to quote for the re-modelling or complete new build get in touch with our installs team today by calling our free phone number on 0800 0213 264 today.